Local design prototype
Montenegro / 2015

Adriatic Sea, Bar

Adriatic Sea, Bar
Project review

Delivery details.

Location
Adriatic Sea, Bar
Supply scope
Pontoons, 48m in total length, with an 8m access gangway and associated equipment
Delivered
2015

Planning a similar project?

Send the location, intended use and any available documents.